The Agronomy department continued as well, with the third application of topdressing sand applied to numbers 1-13. Next week should finally do it with the last of the old greens mix, with the remaining sand located on 15 and 16. It's been a laborious and time consuming process spreading all the sand, but should really pay dividends moving forward. Sand capping and smoothing the tee surfaces continued as well, and will be ongoing for the next few weeks as needed. Sod was installed on the new tee complexes on 1 and 3, and once healed will begin being mowed and groomed. A large section of drainage was installed on the right side of 2, which should help that area tremendously moving forward.
![]() |
Putting and chipping green surface and irrigation being finalized. Sod scheduled to be installed next Tuesday with seed going down next Wednesday. |
![]() |
10 green with new sand mix installed. |
![]() |
Sand being boxed out and smoothed on 11 green. |
![]() |
Sand installation beginning on 12 green. |
![]() |
Sand installation complete on 13 green. |
![]() |
Gravel blanket being smoothed and finalized on 2 green. |
![]() |
One crew installing the drainage and gravel layer inside the greens cavity while a 2nd crew installs the SubAir outfall behind 1 green. |
![]() |
Drainage area complete right of 2 green. Sod installation next week. |
![]() |
3 tee complex was sodded this week. |
![]() |
1 tee complex after sod installation this week. |
![]() |
Guillermo mowing in our new target green at the short game area. |