We hope everyone and their families are doing well and
staying safe. Obviously, much has changed since our last posting and we wanted
to update you on our progress, changes, and plans as we move through these unprecedented
times.
First, we have been taking as much
caution as we can to protect the membership and employees alongside the
precautions taken by the BOD. Steps taken to protect the employees have been:
- No more than 3 employees in the building at any given time to clock in, use the restroom, locker room, or kitchen facilities
- All employees to take lunch in the yard or surrounding area of the building spread out by 6 feet or more
- Employees keep possession of timecards instead of storing them in common area.
- Nitrile safety gloves readily available to employees. We have since run out of disposable dust masks and have been unable to secure more. We’ve provided instructions on how to make their own and we are currently working find some available masks.
- Each employee to sanitize equipment before and after use with provided sanitizer and disposable towels. Focus on steering wheels, keys, gas caps, arm rests, pull cords, handles of all hand equipment and small tools, etc.…
- Supervisors sanitize touch points of building before shifts, after staff leaves building in the AM, after lunch, and after staff leaves for the day. I.e. door handles, faucets, soap and towel dispensers, light switch, air hoses, gas handles and hoses, etc.…
Despite all of these changes, we
continue to strive to provide the best possible golf course experience to our
Members.
The change in operations have given
us the opportunity to be efficient with our current staff in many different
areas. The Monday closures and additional maintenance time have made it
possible to get a majority our mowing and daily tasks completed to minimize
disruption to players for the remainder of the week.
We have done some light
vertictutting and spiking to the greens in recent weeks to aid with several
things. First, we are trying to manage thatch levels. Second, we are making
room for new healthier leaf tissue to grow and fill in leading into the
difficult and hot summer months. Third, we are venting the greens and aiding in
water penetration and air movement.
You may have noticed the greens are getting firmer. This is
due to the new growth both in the green leaf tissue and root mass. As the day
light gets longer, the air warms, and the cooler soil temperatures create great
growing conditions for the bentgrass. The greens are currently packing in more
and more leaf tissue and roots creating the firmer tighter conditions. It is
important to take advantage of this growing window and create the healthiest
plant possible leading into the difficult summer conditions.
The exact opposite will begin to happen in late June and
through September. The bentgrass will decline during the unfavorable conditions
of summer loosing leaf tissue and root mass. Typically, this condition will be
realized by softer slowing conditions, usually by the first 2 weeks of August
and continuing into September before they start grow and recover mid-September
to November when more favorable weather returns.
Overall our goal is to always grow
and create a healthy plant in the spring to ensure we do not have a net loss in
leaf and roots during the summer leading to overall plant loss.
G&G is still on schedule to
aerify the greens on May 4 & 5 to aid in the health of the greens. This
will also relieve the compaction, firmness, and create additional room for new
healthy growth.
G&G has also been doing some
light verticutting in the fairways and approaches. This is done to help thin
the ryegrass and allow the Bermuda to begin to emerge. Typically, we would not
start this procedure until May but have been able to start a few weeks earlier with
the Monday closures.
During the closure of the driving
range we took advantage of the additional time to improve some areas. We raised
and leveled all sprinkler heads on the tees. We edged and cleaned all
irrigation heads on the floor. Added new sand to the floor bunkers and the practice
bunker. Additional herbicides were also sprayed to help eradicate existing
weeds and prevent summer weeds. In addition, we trimmed all the oleanders on
the 10th tee, North tee, and South tee.
On April 20th we
began the process to eliminate the Ryegrass overseed and begin the transition
to our summer bermudagrass. This is 2 weeks earlier than we normally would have
initiated this practice. Once again, due to the changes in operations we wanted
take advantage of the allotted time and be more pro-active on the transition
back to Bermuda grass. Our hope, weather cooperating, was to increase the
Bermuda growing time and increase our success of a smooth and healthy
transition with minimal disruption. The week of the application we will not mow
for a few extra days to give the ryegrass additional exposed leaf tissue to
uptake the product and ensure success. Please bear with us as things will be a
little shaggy for a couple days. The product we use will take 6-8 weeks to
fully remove the ryegrass. You will see the course go off color slightly in the
first 7-10 days and then slightly green back up. From there it will be
slow and subtle removal of the ryegrass into June.
In addition to the ryegrass removal, we began treating and
attacking the existing poa. We use a post emerge selective herbicide this time
of year to target the poa. Our goal is to eradicate the existing plant and
inoculate the seed for future poa. While this will not eradicate the poa
completely, our goal is to keep managing the poa population and reduce the
population for next year and future overseeds. In addition, the use of
pre-emerge herbicides, other post-emerge herbicides, and growth regulators are
utilized throughout the year to pro-actively manage poa.
Since the removal of the sand bottles we have been sending staff out several times a week to fill divots in the tees and fairways. We try to perform the majority of the fairway divot filling on Mondays as it can be very difficult to perform this in play. We will continue to work to keep up with this process while sand bottles are not available.
Since the removal of the sand bottles we have been sending staff out several times a week to fill divots in the tees and fairways. We try to perform the majority of the fairway divot filling on Mondays as it can be very difficult to perform this in play. We will continue to work to keep up with this process while sand bottles are not available.
We wish everyone and their families
health and safety through this time. We thank everyone for their constant
support of the club and its employees.
Regards,
Green & Grounds Department
Great picture of #2 from this past winter the morning after a rain |
Ranger hanging out
Jose spiking the greens |
Close up of the spiking |
Francisco verticutting after the spiking |
Close up of the verticut and spike |
Cleaing up with a mow behind the spiking and verticutting |
Close up of the mow |
Trimming the oleander #10 Tee |